Preliminary project ready for Herat military hospital’s security and defence infrastructure
07.08.2017In mid-June 2017, AS Amhold completed work on the preliminary design for the defence and security infrastructure for Herat military hospital ROLE 2E in Afghanistan. The design work was preceded by engineering, climate and seismological investigations conducted in cooperation with Afghan engineering companies. Three different design concepts were proposed in the course of the design work. The customer will choose one of the concepts to serve as the basis for future design work. The defensive and security structures and infrastructure designed were planned above all to shield buildings from potential terrorist attacks.
- 02.11.2021 The sketch project of the planned logistics building in Lehmja village has been completed
- 12.07.2021 The project of the logistics building to be built at 32 Savi tn in Pärnu received a building permit
- 11.01.2021 Lindab AS production- and logistics centre, project phases IV, V and VI buildings and facilities ready
- 28.01.2019 Construction Project for reconstruction of security facilities and infra systems of the UNESCAP campus in Bangkok completed
- 28.01.2019 Construction project for the reconstruction of Jalalabad Airfield facilities completed
- 28.01.2019 Construction project for the reconstruction of Bagram Airfield facilities completed
- 07.08.2017 Preliminary project ready for Herat military hospital’s security and defence infrastructure
- 06.08.2017 New electrical system design documentation prepared for new wing of Blekinge Hospital in Karlskrona
- 04.08.2017 100% Design project for fuel logistics systems at Kabul International Airport completed
- 03.08.2017 Priśtina CFC campus renovation design project completed in Kosovo
Archive